Final | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Daryl DeGrange
|
|
|
Inspected Mast Phone #: ###-#### >> Inspection requested via web by steve ragan final ok
|
Final | 9/9/2013 | 9/9/2013 | 9/9/2013 | P | NR |
Daryl DeGrange
|
|
|
Repaired top 10ft of Mast Phone #: ###-#### >> Inspection requested via web by steve ragan Not ready for final at this time. Raceway with unfused conductors between meterbase and panel requires a grounding bushing connection
|
Permanent Service | 9/9/2013 | 9/9/2013 | 9/9/2013 | P | PASS |
Daryl DeGrange
|
|
|
Repaired top 10ft of Mast Phone #: ###-#### >> Inspection requested via web by steve ragan p/s o/h rec ok
|
Issue PAID IN FULL permit | | | 8/28/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/28/2013 | | DONE |
|
|
|
This permit was created on the web by steve ragan
|