Final | 2/3/2015 | 2/4/2015 | 2/4/2015 | A | PASS |
Cevyn Recla
|
|
|
Lori Phone #: ###-#### corrections made, final oK
|
Final | 1/30/2015 | 2/3/2015 | 2/3/2015 | P | FAIL |
Cevyn Recla
|
|
|
Lori Phone #: ###-#### 406.12 A Dwelling unit, tamper resistant receptacles required
|
Electrical Rough-In | 1/2/2015 | 1/2/2015 | 1/2/2015 | P | PASS |
Cevyn Recla
|
|
|
Lori Phone #: ###-#### corrections have been made to kitchen circuits. Owners are going to hire a contractor for service change to allow for new circuits to be added to meter main service. will check ground make up for kithchen outlets at service inspeciton time.. Kitchen OK to cover
|
Electrical Rough-In | 12/30/2014 | 12/31/2014 | 12/31/2014 | A | FAIL |
Rock A. Hudson
|
|
|
Lori-calling in for homeownerplease call meet-Phone #: ###-#### 210.52- Kitchen counter top receptical outlets shall be fed by a minimum of 2 20 amp 120 volt circuits. Small appliance circuits shall be dedicated to counter top recepticals or appliances, no lighting. 2nd circuit required for counter top outlets. 1 circuit for dishwasher/ disposal. 300.4- NM cable shall be secured1 1/4" from framing surface. Where bored holes are less than 1 1/4" from surface nail plate shall be used. 310.15- All 20 amp 120 volt circuits shall be minimum of 12-2 NM cable from start of circuit to end of circuit. Meter base has 30/40 quad on 15 and 20 amp wire.
|
ELE-Request for Extension | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | PASS |
Cevyn Recla
|
|
|
Mike Phone #: ###-#### Spoke to homeowner, they are moving forward with the renovation, and plan to have RI ready to inspect in near future. Extension given.
|
Conference | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | DONE |
Rock A. Hudson
|
|
|
After 1:30 please - Mike Phone #: ###-#### Discussed required receptical spacing and circuits for kitchen remodel, and inspection process.
|
Issue PAID IN FULL permit | | | 10/25/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Issue PAID IN FULL permit | | | 10/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 10/25/2013 | | |
|
|
|
|