Final | 11/8/2013 | 11/12/2013 | 11/13/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by steve ragan correction done final ok
|
Final | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by steve ragan 250.24- The grounding electrode conductor shall terminate at the same terminal or bus bar as the grounded conductor
|
Final | 11/5/2013 | 11/6/2013 | 11/5/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by steve ragan 110.14 Dissimilar metals shall not land under same lug. 250.24- Grounding electode conductor shall land at the same lug or terminal as grounded conductor.
|
Permanent Service | 11/5/2013 | 11/5/2013 | 11/5/2013 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by steve ragan p/s o/h rec ok
|
Issue PAID IN FULL permit | | | 11/4/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/4/2013 | | DONE |
|
|
|
This permit was created on the web by steve ragan
|