Final | 1/2/2018 | 1/2/2018 | 1/2/2018 | A | PASS |
James Ady
|
|
|
Aging. Solar pre-wire final. Call Abby ###-#### Solar pre-wire only! Final ok
|
ELE-Aging Inspection | 12/8/2017 | 12/8/2017 | 12/14/2017 | | PASS |
James Ady
|
|
|
Left correction on door with contact information.
|
Final | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | CANC |
Bob Reichert
|
|
|
Moved Romex stub-outs to 3 feet from gas meter as per Daryl Degrange inspection notes. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay see ri
|
Electrical Rough-In | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | PASS |
Bob Reichert
|
|
|
Moved Romex stub-outs to 3 feet from gas meter as per Daryl Degrange inspection notes. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay correction made, ri ok
|
Electrical Rough-In | 12/5/2013 | 12/6/2013 | 12/6/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Electrical rough-in for future solar PV array on 2 south facing roofs. PV power will be micro-inverted to AC power on the roof, run through 10-3 romex in attic, outside to AC disconnect, back inside to main panel. Array will be grounded with a #6 from the roof to the main ground at foundation. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay NEC 110.26 Working clearance for solar array disconnecting means
|
Issue PAID IN FULL permit | | | 12/4/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/4/2013 | | DONE |
|
|
|
This permit was created on the web by Matthew Dunay
|