Final | 10/31/2014 | 10/31/2014 | 10/31/2014 | P | PASS |
Daryl DeGrange
|
|
|
please close garage door when done. button at front north corner. thanks. Phone #: ###-#### Inspection requested via web by Mark Estep GFCI breaker installed on non-grounding branch circuit, final ok
|
Final | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Estep receptacles have been replaced with new temper resistant grounding type device. Several grounding receptacles in the basement are without connection of grounding conductor. NEC 406.9 Shall connect grounding conductor or provide GFCI protection, replace with two wire device.
|
Final | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | FAIL |
Bob Reichert
|
|
|
mark Phone #: ###-#### met builder, shall fix hid lighting in garage (shall hardwire or move fixture to below receptacle) and 2 receptacles shall be properly wired in basement (shall provide power)
|
Fees Due Hold | 2/20/2014 | | 5/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Electrical Rough-In | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark Estep rough-in ok cover
|
Electrical Rough-In | 2/19/2014 | 2/19/2014 | 2/19/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark Estep Not all corrections completed
|
Electrical Rough-In | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | FAIL |
Doug A Poedy
|
|
|
Need to secure romex within 6 inch from box. Box fill
|
Final | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | CANC |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark Estep.
|
Final | 1/1/2014 | 1/2/2014 | 1/2/2014 | A | NR |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark Estep Not ready for final at this time
|
Permanent Service | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark Estep p/s u/g rec ok
|
Final | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | NR |
Daryl DeGrange
|
|
|
Please call me before you head over to job. Thanks Phone #: ###-#### >> Inspection requested via web by Mark Estep canceled by contractor
|
Final | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark Estep Hire licenced contractor to complete corrections, Strap service raiser witin 3 ft. of meterbase. All NM cables shall enter service panel through listed connector. Separate grounding conductor from neutral bar in remote panel
|
Final | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | FAIL |
Daryl DeGrange
|
|
|
Door at rear of garage will be open. Please call me and I will probably be able to meet you. Thanks. Phone #: ###-#### >> Inspection requested via web by Mark Estep NEC 250.56 Verify concrete encased electrode or add two ground rods. Separate all grounds and neutrals,NEC 312.5(C) Provide connector or abrasion protection for romex entring panel
|
Issue PAID IN FULL permit | | | 12/9/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/9/2013 | | DONE |
|
|
|
This permit was created on the web by Mark Estep
|