Final | 5/1/2014 | 5/5/2014 | 5/5/2014 | A | PASS |
Daryl DeGrange
|
|
|
Joyce Phone #: ###-#### correction done, final ok
|
Final | 4/30/2014 | 5/1/2014 | 5/1/2014 | A | FAIL |
Daryl DeGrange
|
|
|
joyce Phone #: ###-#### Electrical floor heat requires GFCI protection
|
Electrical Rough-In | 2/20/2014 | 2/21/2014 | 2/21/2014 | P | PASS |
Daryl DeGrange
|
|
|
recheck of the heated flooring Phone #: ###-#### rough-in ok cover floor heat
|
Electrical Rough-In | 2/3/2014 | 2/4/2014 | 2/4/2014 | P | PASS |
Bob Reichert
|
|
|
Ben Phone #: ###-#### ri ok
|
Conference | 1/15/2014 | 1/17/2014 | 1/17/2014 | P | DONE |
Daryl DeGrange
|
|
|
Ben-Please call prior to inspection Phone #: ###-#### Discussed with home owner electrical requirements for master bathroom remodel
|
Issue PAID IN FULL permit | | | 1/15/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Issue PAID IN FULL permit | | | 1/15/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 1/15/2014 | | |
|
|
|
|