Final | 2/5/2014 | 2/6/2014 | 2/6/2014 | A | PASS |
Daryl DeGrange
|
|
|
Inspect wiring to pos Phone #: ###-#### >> Inspection requested via web by shane miller job complete, final ok
|
Electrical Rough-In | 1/20/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Daryl DeGrange
|
|
|
Electrical rough in 3 dedicated printer circus installed in wall 2 up in the ceiling ready to be dropped into the point of sales and one outlet in newly framed wall that''s waiting for sheetrock. call Mickey Johnson at ###-####9 to unlock door he has several stores down at the UPS Store Phone #: ###-#### >> Inspection requested via web by shane miller rough-in ok cover wall
|
Issue PAID IN FULL permit | | | 1/20/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/19/2014 | | DONE |
|
|
|
This permit was created on the web by shane miller
|
First Notice | 2/6/2014 | 2/6/2014 | | | |
Daryl DeGrange
|
|
|
|