Final | 5/22/2014 | 5/28/2014 | 5/28/2014 | A | PASS |
Daryl DeGrange
|
|
|
Craig Phone #: ###-#### final ok
|
Electrical Rough-In | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | PASS |
Daryl DeGrange
|
|
|
Craig-after 4:00 if possible Phone #: ###-#### rough-in ok cover walls
|
Conference | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | DONE |
Daryl DeGrange
|
|
|
Craig Phone #: ###-#### Discussed with homeowner electrical requirements for the addition of receptacles in garage, Did advise homeowner of exsiting service panel installed where highest breaker location was well above 6ft 7in.
|
Miscellaneous action | | | 4/16/2014 | | DONE |
Tisha Gallop
|
|
|
scanned documents (application and homeowners agreement) did not come through. There was an error on the machine, and customer left with all paper work.
|
Application received | | | 4/15/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/15/2014 | | DONE |
|
|
|
|