Final | 8/6/2014 | 8/7/2014 | 8/7/2014 | A | PASS |
Daryl DeGrange
|
|
|
Abe-As early as possibke please Phone #: ###-#### final ok
|
Electrical Rough-In | 7/3/2014 | 7/7/2014 | 7/7/2014 | A | PASS |
Daryl DeGrange
|
|
|
First thing - Abe Phone #: ###-#### correction done rough-in ok cover
|
Rough-In Permanent Service | 6/30/2014 | 6/30/2014 | 6/30/2014 | P | FAIL |
Daryl DeGrange
|
|
|
Abraham (GC will be on site Ken Williams ###-####) Phone #: ###-#### Install nail plate as per manufactures requirements. NEC 334.30 Shall staple NM cable within 12 in. of device boxes. NEC 314.29 Junction boxes shall be install so that the wiring contained in them can be rendered accessible without removing any part of the building. Complete make ups inside device boxes.
|
Conference | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | DONE |
Daryl DeGrange
|
|
|
Abe Phone #: ###-#### Discussed with homeowner electrical requirement for livingroom addition
|
Issue PAID IN FULL permit | | | 6/23/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
(F) Reprint permit | | | 6/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 6/23/2014 | | |
|
|
|
|