Final | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Daryl DeGrange
|
|
|
job complete, final ok
|
Electrical Rough-In | 8/4/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling Inspection for 12 or early afternoon. Please contact Wayne Plocharksy with install questions. Phone #: ###-#### Inspection requested via web by Pam Damewood rough-in ok cover ceiling grid
|
Electrical Rough-In | 7/28/2014 | 7/29/2014 | 7/29/2014 | A | PASS |
Daryl DeGrange
|
|
|
Re-Inspection for Hearing Booth. Please contact Wayne Plocharsky with install questions. Phone #: ###-#### >> Inspection requested via web by Pam Damewood Correction done, rough-in ok cover Hearing testing booth
|
Electrical Rough-In | 7/25/2014 | 7/28/2014 | 7/28/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Wayne-Hearing Booth Phone #: ###-#### NEC 320.12(1) Install where subject to physical damage. MC installed running length wise inside 2x4 steel studs.
|
Change Status to I | | | 7/25/2014 | | DONE |
|
|
|
Should not be finaled doing in stages7-25-14
|
Final | 7/18/2014 | 7/21/2014 | 7/21/2014 | A | PASS |
Daryl DeGrange
|
|
|
Please contact Wayne Plocharsky with any install questions at the above number Phone #: ###-#### >> Inspection requested via web by Pam Damewood final ok
|
Electrical Rough-In | 7/7/2014 | 7/10/2014 | 7/10/2014 | A | PASS |
Daryl DeGrange
|
|
|
Pharmacy Cover Inspection. Please contact Wayne Plocharsky at the above number with install questions. Phone #: ###-#### >> Inspection requested via web by Pam Damewood Exam room A/C cable rough-in ok cover walls
|
Issue PAID IN FULL permit | | | 7/7/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 7/7/2014 | | |
|
|
|
|
Application received | | | 7/7/2014 | | DONE |
|
|
|
This permit was created on the web by Pam Damewood
|
First Notice | 8/5/2014 | 8/5/2014 | | | |
Daryl DeGrange
|
|
|
|
First Notice | 7/21/2014 | 7/21/2014 | | | |
Daryl DeGrange
|
|
|
|