First Notice | 8/1/2014 | 8/1/2014 | 8/25/2014 | | DONE |
Daryl DeGrange
|
|
|
This permit finaled on the web by Dan Mitchell
|
Final | 7/30/2014 | 8/1/2014 | 8/1/2014 | A | PASS |
Daryl DeGrange
|
|
|
Ran a dedicated 20 amp 120 volt circuit for the existing ceiling heater in the bathroom. Phone #: ###-#### Inspection requested via web by Dan Mitchell final ok
|
Electrical Rough-In | 7/30/2014 | 8/1/2014 | 8/1/2014 | A | PASS |
Daryl DeGrange
|
|
|
Ran a dedicated 20 amp 120 volt circuit for the existing ceiling heater in the bathroom. Phone #: ###-#### Inspection requested via web by Dan Mitchell rough-in ok
|
Issue PAID IN FULL permit | | | 7/29/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/29/2014 | | DONE |
|
|
|
This permit was created on the web by Dan Mitchell
|