Final | 9/2/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Daryl DeGrange
|
|
|
###-#### / Final inspection requested Phone #: ###-#### Inspection requested via web by jamie berg final ok
|
Final | 8/18/2014 | 8/18/2014 | 8/18/2014 | P | NR |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by jamie berg Not ready at this time, power has not been connected to test receptacles and lighting fixtures
|
Rough-In Permanent Service | 8/18/2014 | 8/18/2014 | 8/18/2014 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by jamie berg rough-in p/s u/g n ok
|
Permanent Service | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | FAIL |
Daryl DeGrange
|
|
|
Call for inspection Cindy ###-#### / ###-#### Service inspection 200 amp Inspection requested via web by jamie berg NEC 250.53 Where practicable rod,pipe and plate electrode shall be embedded below permanent moisture level, drive two ground rods
|
Issue PAID IN FULL permit | | | 8/1/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/1/2014 | | DONE |
|
|
|
This permit was created on the web by jamie berg
|