Final | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Rex Boyles
|
|
|
Please call ahead to meet - Dave Phone #: ###-#### final ok corrections made
|
Conference | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | DONE |
Rex Boyles
|
|
|
conference with dave of solar cascade on PV and generator hook up
|
Conference | 9/17/2014 | 9/18/2014 | 9/18/2014 | A | DONE |
Bob Reichert
|
|
|
As per our conversation on site consult at 8:00 am thanks Dave ###-#### Phone #: ###-#### Inspection requested via web by Dave Brueggemann met contractor and 346 to review acceptacle installation for transfer switch
|
Final | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | NR |
Bob Reichert
|
|
|
Dave Phone #: ###-#### met contractor, discussed j-box, wireway sizes, labelling, bond bushings, will re-do in raceways only and re-call, left message about overcurrent protection- called to have dave call for conference in am
|
Final | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | FAIL |
Rex Boyles
|
|
|
Call jerry ###-#### if questions Phone #: ###-#### Inspection requested via web by Dave Brueggemann guy kit needed on riser and strap below roofline. Raintite fittings needed on transfer switch. 400.8 (B)(1) (6) (7) cords not permitted . 400.9-cord splicing not permitted
|
Issue PAID IN FULL permit | | | 9/9/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/9/2014 | | DONE |
|
|
|
This permit was created on the web by Dave Brueggemann
|