Final | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Eric Story
|
|
|
Mark-would like to know if you can go early PM with a 20 minute call prior Phone #: ###-#### corrections made final ok
|
Final | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | FAIL |
Eric Story
|
|
|
Mark Phone #: ###-#### tamper resistant gfci and in-use covers required 406.4
|
Electrical Rough-In | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PART |
Daryl DeGrange
|
|
|
Mark Phone #: ###-#### partial cover ok, all but area at service panel. Branch circuits to exsisting house yet to be terminated
|
Permanent Service | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PASS |
Daryl DeGrange
|
|
|
Mark Phone #: ###-#### p/s o/h rec ok
|
Electrical Rough-In | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Daryl DeGrange
|
|
|
Please call 20min ahead for access - Mark Phone #: ###-#### Bond metal nipple between meterbase and panel, complete make-ups for rough-in inspection, ceiling fan boxes shall be listed.
|
Conference | 12/18/2014 | 12/19/2014 | 12/19/2014 | P | DONE |
Cevyn Recla
|
|
|
call a half hour before// Mark Phone #: ###-#### Discussed requirements for AFI protection in beds and smokes, subpanel, riser for overhead, power to mini split ac's, service outlet for acs,
|
Conference | 11/3/2014 | 11/3/2014 | 11/3/2014 | P | DONE |
Cevyn Recla
|
|
|
Mark// please call before// needs 30 min notice Phone #: ###-#### Discussed requirements for subpanel location, and code requirements for homeowner addition.
|
Conference | 9/12/2014 | 9/15/2014 | 9/15/2014 | P | PASS |
Rex Boyles
|
|
|
Mark Phone #: ###-#### discuss new service location and sub panel
|
Application received | | | 9/12/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2014 | | DONE |
|
|
|
|