Final | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | PASS |
Cevyn Recla
|
|
|
Corrections completed. Thanks Phone #: ###-#### Inspection requested via web by Randy Fletcher Corrections have been made, ok to allow floor heat per Daryl DeGrange. Final OK
|
Final | 1/8/2015 | 1/9/2015 | 1/9/2015 | A | FAIL |
Cevyn Recla
|
|
|
Final on bath remodel and hot tub disconnect. Phone #: ###-#### Inspection requested via web by Randy Fletcher called randy 424.44 G GFI protection required for bath floor heat 422.31 disconnecting means required for permanently installed appliances 422.11 over current protection shall be sized to rating marked on appliance 372.13 abandoned outlets and conductors shall be removed 110.12A unused openings shall be closed NO inspection performed on floor heat installation
|
Electrical Rough-In | 11/3/2014 | 11/3/2014 | 11/3/2014 | A | PASS |
Cevyn Recla
|
|
|
Bath rough-in Phone #: ###-#### Inspection requested via web by Randy Fletcher
RI, Ok to cover. Check for shower steamer at final
|
Issue PAID IN FULL permit | | | 11/3/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/3/2014 | | DONE |
|
|
|
This permit was created on the web by Randy Fletcher
|