VOIDED CHANGE STATUS | | | 12/8/2014 | | DONE |
|
|
|
Per Trent Swaim- voided permit because job isn't being done
|
Electrical Rough-In | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | NR |
Cevyn Recla
|
|
|
THIS IS FOR UNDERGROUND POWER INSPECTION ONLY. Underground inspection is not an option so I did rough in inspection. Trench is in residential backyard which requires 18" minimum, did not know if you needed to see it or not ###-####. AM or PM will work. Phone #: ###-#### Inspection requested via web by Cindie Swaim Not REady, conduit not installed in trench yet
|
Issue PAID IN FULL permit | | | 11/4/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/3/2014 | | DONE |
|
|
|
This permit was created on the web by Cindie Swaim
|