Print Statement | | | 3/21/2016 | | DONE |
|
|
|
|
First Notice | 8/26/2015 | 8/26/2015 | 3/16/2016 | | DONE |
Rex Boyles
|
|
|
This permit finaled on the web by Sean DeLacy
|
Final | 8/25/2015 | 8/26/2015 | 8/26/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok 2nd flr and 5th floor corridors, parking garage, parking lot and street pole lights. final ok on 100% perm. occupancy ok
|
Electrical Rough-In | 8/24/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Rock A. Hudson
|
|
|
Levi. Levels 2 ; 3. Phone #: ###-#### Inspection requested via web by Sean DeLacy Rooms 200 thru 210 and 300 thru 310 ok occupy
|
Electrical Rough-In | 8/24/2015 | 8/24/2015 | 8/24/2015 | P | PASS |
Eric Story
|
|
|
Levi. Final level 4. Phone #: ###-#### Inspection requested via web by Sean DeLacy rooms 400 thru 410 on fourth floor ok to occupy
|
Electrical Rough-In | 8/20/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Rock A. Hudson
|
|
|
Levi. Tower 4 Pods: floors 2, 3 ; 4 Phone #: ###-#### Inspection requested via web by Sean DeLacy 5th floor rooms 500 thru 505 only Final ok
|
Electrical Rough-In | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Final tower 4 Corridor inspection. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok 5th flr corridor only. 4th flr not ready
|
Electrical Rough-In | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Pods on towers 3 ; 4 levels 5 ; 4 final. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok rms 506 thru 509
|
Electrical Rough-In | 8/4/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Tower 3 floor #2 final. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok on rms. 210 thru 215. Also corrections made final ok rms. 313 and 314
|
Electrical Rough-In | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | PART |
Rex Boyles
|
|
|
Levi. Tower 3 3rd floor final. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok rms 310 thru 315 except no power to receptacle in rm. 313 and 314 no receptacle in bdrm.
|
Electrical Rough-In | 7/28/2015 | 7/29/2015 | 7/29/2015 | P | FAIL |
Rex Boyles
|
|
|
Levi. Tower 3 floors 4 ; 5 finals. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok for rms. 410 thru 415 and 510 thru 515 FAIL is for the appliances in these rooms being installed by appliance supplier wired incorrectly and not wired by electricans. The dryers have no connectors and nuetrals and grounds not being separated. Ranges have same problem. Asked ESI and RME to go back and check all appliances in complex now.
|
Electrical Rough-In | 7/27/2015 | 7/27/2015 | 7/27/2015 | P | PART |
Rex Boyles
|
|
|
Levi. Final on Gym area only. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok on gym and bathrooms and ceilings.NOTE:Pool and spa pump motors need to be GFCI protected as per NEC 680.22(B)
|
Electrical Rough-In | 7/9/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Rex Boyles
|
|
|
Tower 2 Floor 2 Final. Levi is the onsite contact Phone #: ###-#### Inspection requested via web by Buster Bowen final ok tower2 2nd flr. rms and hallways. ALSO final ok tower 2 5th flr. rms and hallways final ok
|
Electrical Rough-In | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Tower #2 Floors 4 ; 5 partial final. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok tower 4 corridor ceiling
|
Final | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | PART |
Rex Boyles
|
|
|
Levi. Tower #2 Floors 4 ; 5 partial final. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok tower 2 3rd floor and 4th floor (see final e sheet from Levi)
|
Electrical Rough-In | 7/6/2015 | 7/7/2015 | 7/7/2015 | P | CANC |
Rex Boyles
|
|
|
Levi. Tower #4 Floor #2. Phone #: ###-#### Inspection requested via web by Sean DeLacy not ready
|
Electrical Rough-In | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | NR |
Rex Boyles
|
|
|
Levi. Tower #2 5th Floor Final. Phone #: ###-#### Inspection requested via web by Sean DeLacy partial final/not 100% ready
|
Electrical Rough-In | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Tower #4 Floor 2 Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i rm. soffits in rms. 200 thru 209 ok
|
Electrical Rough-In | 7/6/2015 | 7/7/2015 | 7/6/2015 | A | CANC |
Rex Boyles
|
|
|
Levi. Tower 4 soffit cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|
Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Tower #4 Corridors 3rd ; 4th floors. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok
|
Electrical Rough-In | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Lobby Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok lobby tbar ceilings ok to cover
|
Electrical Rough-In | 6/19/2015 | 6/22/2015 | 6/22/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Maintenance Room. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok maint. rm. walls ok
|
Electrical Rough-In | 6/19/2015 | 6/22/2015 | 6/22/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Tower #4. 5th Floor Soffits. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i walls maintenence room and tower4 level 5 corridor hard lid also ok Will add 1 access panel for j boxes at pod
|
Electrical Rough-In | 6/19/2015 | 6/19/2015 | 6/19/2015 | P | CANC |
Eric Story
|
|
|
Levi. Maintenance Room. Phone #: ###-#### Inspection requested via web by Sean DeLacy insulation in the way could not see electrical install
|
Electrical Rough-In | 6/15/2015 | 6/16/2015 | 6/16/2015 | A | PART |
Daryl DeGrange
|
|
|
Levi. Tower #1 Partial Final units #4 Phone #: ###-#### Inspection requested via web by Sean DeLacy partial final rooms 430 thur 437
|
Electrical Rough-In | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | PART |
Daryl DeGrange
|
|
|
Levi. Partial Final Tower #1 Floor #5. Phone #: ###-#### Inspection requested via web by Sean DeLacy partial final for rooms 530 thur 537
|
Electrical Rough-In | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Tower #4 Floor #3 Soffits. Phone #: ###-#### Inspection requested via web by Sean DeLacy soffits or drop ceilings r/i ok in rms see am inspection for rms. on same day
|
Electrical Rough-In | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Rex Boyles
|
|
|
Tower #1 Floor #3 Final. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok drop ceilings in rms. 300 thru 309, FINAL in rms 330 thru 337 ok
|
Electrical Rough-In | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Partial Final on Tower #1 floors #2 ; #3. Phone #: ###-#### Inspection requested via web by Sean DeLacy FINAL RMS. 230 thru 237 ok. r/i ok west trash enclosure walls and west sidewalk underground to precast light poles ok
|
Electrical Rough-In | 6/8/2015 | 6/10/2015 | 6/10/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Tower #4 Floors 3rd - 4th Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i 4th floor drop ceilings or soffits and south trash rm. ceiling ok
|
Electrical Rough-In | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Tower 3 ; 4 floors 4 ; 5. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i soffits rms. 406,407,408a nd 409. also rms. on 5th flr south pods ok
|
Electrical Rough-In | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Lobby cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy lobby ceiling ok
|
Electrical Rough-In | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | NR |
Rex Boyles
|
|
|
Levi. Lobby cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy not ready
|
Electrical Rough-In | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Tower 2 Elevator Lobby''s 2-5. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i elevator lobby #1 ceilings 2 thru 5 ok
|
Electrical Rough-In | 5/15/2015 | 5/18/2015 | 5/18/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower #3 Floor #2 ; #3 Corridor soffits. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok 2nd and 3rd flr rm. soffits in tower 3
|
Electrical Rough-In | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PASS |
Rex Boyles
|
|
|
Levi. Soffit cover Tower #3 4th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok tower3 4th flr rm. soffits
|
Electrical Rough-In | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Soffit cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok elevator lobby ceilings on all levels in tower 1
|
Electrical Rough-In | 4/29/2015 | 4/30/2015 | 4/30/2015 | P | PASS |
Rex Boyles
|
|
|
Dave. Tower #3 Corridor Soffits 3rd ; 4th floors. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 1 and 2 corridors 100% tower 3 2nd flr corridor r/i ok
|
Electrical Rough-In | 4/29/2015 | 4/29/2015 | 4/29/2015 | P | PASS |
Rex Boyles
|
|
|
Dave. Tower 2. 4th floor soffit cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok tower 2 2nd flr rm. soffits and tower 3 5th flr rm. soffits r/i ok
|
Electrical Rough-In | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Rex Boyles
|
|
|
Dave 4th Floor Corridor Tower #2. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 1 and 2 3rd and 4th flr corridor ceilings r/i ok
|
Electrical Rough-In | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Rex Boyles
|
|
|
5th Floor corridor cover for Tower Phone #: ###-#### Inspection requested via web by Buster Bowen 5th flr corridor tower 3 r/i ok
|
Electrical Rough-In | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower 5th Floor Soffit Cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower1 and 2 level 5 corridors ok to cover. Also discuss pool bonding and countertop kitchen receptacle spacing
|
Electrical Rough-In | 4/9/2015 | 4/10/2015 | 4/10/2015 | P | PASS |
Rex Boyles
|
|
|
Levi. Tower #2 3rd Floor Soffits. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i tower 2 3rd floor room soffits ok
|
Electrical Rough-In | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Rex Boyles
|
|
|
Tower 2 Stairwell #1. Tower #2 Podium. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 4 podium level rms. 200 thru 205, elevator lobbys level 2 thru 5 and stairwell #1 r/i ok
|
Final | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | NR |
Rex Boyles
|
|
|
Levi. Tower 2 4th floor soffits. Tower 3 corridor hard lids floors 2 thru 5. Phone #: ###-#### Inspection requested via web by Sean DeLacy need fault current label on main disco.NEC 110.24
|
Change Status to I | | | 4/7/2015 | | DONE |
|
|
|
Shouldn't have been FNL
|
Electrical Rough-In | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PASS |
Rex Boyles
|
|
|
Towers 3 ; 4 Floors 2 ; 3 floor units ; lobby. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i tower 4 rms. 300 thru 305 and lobby and office walls ok
|
Electrical Rough-In | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Rex Boyles
|
|
|
Dave. Tower #2 soffit cover ; Gym wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok
|
Electrical Rough-In | 3/30/2015 | 3/31/2015 | 3/31/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Towers 3 ; 4 Levels 4 ; 5. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 3 rms 406 thru 409 and 506 thru509 and corridors ok. tower 4 rms 400 thru 405 and rms. 500 thru 505 and corridors ok NOTE: room 402 MC HR broken
|
Electrical Rough-In | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | CANC |
Rex Boyles
|
|
|
Dave. Tower #3 Corridor. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 3 and 4 corridors r/i ok
|
Electrical Rough-In | 3/17/2015 | 3/17/2015 | 3/17/2015 | P | PASS |
Rex Boyles
|
|
|
Dave. 1st Floor Soffits. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i tower 1 level 1soffits ok
|
Electrical Rough-In | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower #3 Podium ; 3rd floor units. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i tower 3 rms. 210 thru 215 and 310 thru 315 ok
|
Electrical Rough-In | 3/11/2015 | 3/12/2015 | 3/12/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Towers 3 ; 4. Floors 2 ; 5 corridors. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i tower3 and tower 4 level 2 corridor walls ok. Tower3 level 4corridor , stairwell and telco rm.walls ok. Tower3 level 5 corridor walls ok
|
Electrical Rough-In | 3/6/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Rex Boyles
|
|
|
Dave. Tower #3 Common areas. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok tower3 rms.410 thru 415 and common area tower 2
|
Electrical Rough-In | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower #3 5th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower3 level 5 rms 510 thru 515 only r/i ok
|
Electrical Rough-In | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower #1 Level 3 Soffit Cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i soffits ok
|
Electrical Rough-In | 2/6/2015 | 2/9/2015 | 2/9/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower #1 4th floor soffits. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower1 4th floor soffits r/i ok
|
Electrical Rough-In | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PASS |
Rex Boyles
|
|
|
Tower #1 5th floor soffit cover. Dave is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen r/i soffits ok 5th floor
|
Electrical Rough-In | 1/28/2015 | 1/29/2015 | 1/29/2015 | A | PASS |
Rex Boyles
|
|
|
Tower #2 corridor wall cover all floors. Levi is the on site Phone #: ###-#### Inspection requested via web by Buster Bowen r/i ok tower 2-level 2,3,4 and 5 corridors. Level 3 n.east unit r/i ok
|
Electrical Rough-In | 1/21/2015 | 1/22/2015 | 1/22/2015 | P | PASS |
Rock A. Hudson
|
|
|
Rough in cover for tower #2 floors 4 and 5. Dave is the on site contact Phone #: ###-#### Inspection requested via web by Buster Bowen 10 units each floor as noted in office. Rough in ok cover
|
Electrical Rough-In | 1/15/2015 | 1/16/2015 | 1/16/2015 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower 2 floors 2 thru 5. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok level 3 only (all but N.East corner unit)
|
Electrical Rough-In | 1/9/2015 | 1/9/2015 | 1/9/2015 | P | PASS |
Rex Boyles
|
|
|
Dave. Stairwell rough-in cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok stairwell 3 podium level, and 3 and 4
|
Electrical Rough-In | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | PASS |
Rex Boyles
|
|
|
Wall cover. 5th floor Tower 1. Dave is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen r/i 5th floor corridor ok drywall removed for inspection
|
Electrical Rough-In | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower 1 corridors. Phone #: ###-#### Inspection requested via web by Sean DeLacy all corridors in tower 1 except level. Allready drywalled! asked contractor to remove around hallway receptacles. No more warnings.
|
Electrical Rough-In | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | NR |
Rex Boyles
|
|
|
Dave. Tower #2 3rd Floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy not ready
|
Electrical Rough-In | 11/25/2014 | 12/1/2014 | 12/1/2014 | A | PASS |
Rex Boyles
|
|
|
Dave. Tower 2 Floor 2 ; 3 cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok tower 2 podium level 8 rooms
|
Issue PAID IN FULL permit | | | 11/24/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/24/2014 | | DONE |
|
|
|
This permit was created on the web by Sean DeLacy
|
Electrical Rough-In | 11/14/2014 | 11/17/2014 | 11/17/2014 | P | PASS |
Rex Boyles
|
|
|
Dave. Floor #3 Tower #1. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok 7rooms tower 1 level3
|
Electrical Rough-In | 11/13/2014 | 11/14/2014 | 11/14/2014 | P | PASS |
Rex Boyles
|
|
|
Cover for 2nd and 4th floors. Dave is the onsite contact Phone #: ###-#### Inspection requested via web by Buster Bowen r/i ok 7 rooms tower1 level 4
|
Electrical Rough-In | 11/13/2014 | 11/13/2014 | 11/13/2014 | P | CANC |
Rex Boyles
|
|
|
Dave is the onsite contact. Phone #: ###-#### >> Inspection requested via web by Buster Bowen Inspection cancelled from web by: Buster Bowen
|
Electrical Rough-In | 11/12/2014 | 11/13/2014 | 11/13/2014 | P | PASS |
Rex Boyles
|
|
|
Dave. Cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 1 level 5 7rms r/i ok
|
Electrical Rough-In | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Rex Boyles
|
|
|
Dave. Tower #1 cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 1 podium level r/i 7 rooms only ok
|
Conference | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | DONE |
Daryl DeGrange
|
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy Discused with electrical contractor ability to start rough-in with NM cable prior to structural roof and dry sheeting, denied.
|