Final | 12/8/2016 | 12/8/2016 | 12/8/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Betty Garage expansion no damage from flood. Final ok
|
Electrical Rough-In | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Rock A. Hudson
|
|
|
Garbage Compactors Motor Disconnects and Controllers and Container Winch Motor Disconnects and Controllers @ Loading Dock Phone #: ###-#### Inspection requested via web by Tom Betty Rough in ok. Will check flexible cord when controls mounted where needed.
|
Final | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | PART |
Rock A. Hudson
|
|
|
Warren Wing with State of Idaho has been notified of concerns with elevator rooms. Temp occupancy of garage expansion ok
|
Final | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | FAIL |
Rock A. Hudson
|
|
|
Partial Final with a few exclusions Men and Women Locker Rooms Phone #: ###-#### Inspection requested via web by Tom Betty Due to the condition of electrical equipment and wiring installed for elevators I felt life safety issues present. The City of Boise does not have jurisiction over elevator installations however I have informed Daryl DeGrange Chief Electrical Inspector of issues and he will call head of state to inform of condition. When he informs me how to proceed I will make appropriate calls. Receptacle outlet buried behind plywood in maintenance office, electrical rooms and disconnect area work space shall not be used as storage, box in rm 115A needed on wiring, ele rm G114 door would not open, fire pumps in off position due to leak, misc receptacles not working B1A-3, B1C-9, B1A-1315 17, damaged receptacle covers B1B-13, N.E.corner of garage. Not holding temp occupancy for parking garage for misc items just elevator rooms.
|
Electrical Rough-In | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Rock A. Hudson
|
|
|
Stair SF-03 and 1ST3 walls. Electrical relocated area noted wall rough in ok cover
|
Electrical Rough-In | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | FAIL |
Daryl DeGrange
|
|
|
Stairwell SF-03 and 1ST3 Walls Phone #: ###-#### Inspection requested via web by Tom Betty NEC 314.29 J-boxes shall be rendered accessible, LV j-box behind stairway hand rail. NEC 358.30 EMT shall be scurely fastened within 3ft. of each junction box.
|
Electrical Rough-In | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Rock A. Hudson
|
|
|
Call Brandon for Heat trace rough in basement PLumbing and Fire Sprinkler piping. Phone #: ###-#### Inspection requested via web by Tom Betty About 1/2 heat trace installed without end caps or starter kits for testing. Rough in ok cover
|
Electrical Rough-In | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Eric Story
|
|
|
Garage EXP Locker RM ceilings Lighting cover Insp. RM # 108 ,136 Phone #: ###-#### Inspection requested via web by Tom Betty locker rooms hard lids and walls only ok cover
|
Electrical Rough-In | 7/13/2016 | 7/13/2016 | 7/13/2016 | A | PASS |
Rock A. Hudson
|
|
|
Garage expansion room OB-G120 future concierge Phone #: ###-#### Inspection requested via web by Tom Betty Walls and insulate lid at area noted. Rough in ok cover.
|
Electrical Rough-In | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Rock A. Hudson
|
|
|
electrical underground, in deck pour for concrete. Phone #: ###-#### Inspection requested via web by Tom Betty Lower level lid opening was for materials to be delivered. Pour rough in ok cover
|
Electrical Rough-In | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Rex Boyles
|
|
|
SE-17,18 and IR-1 power and controls Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok for de watering pumps in vault. All SO cords spliced to bare conductors from submersable pumps connections ok
|
Conference | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | DONE |
Rex Boyles
|
|
|
Confirm what is necessary for permanent power MSSC,MSSD,MSSE Phone #: ###-#### Inspection requested via web by Tom Betty discuss energizing gear noted above to keep project progressing. Tom will make x former room totally lockable, will make main electrical room lockable, accessable to electricians only, will lock off all other distribution. Will call for inspection prior to energizing any loadcenters,panelboards or buss duct. Performance testing completed already on medium voltage wiring, transformers and 480 volt main disconnects. Tom will call for electrical r/i when ready to energize.
|
Rough-In Permanent Service | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | CANC |
Daryl DeGrange
|
|
|
Medium Voltage- Xfmer Loop Owners Loop Phone #: ###-#### Inspection requested via web by Tom Betty not ready
|
Conference | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | DONE |
Daryl DeGrange
|
|
|
Medium Voltage- Xfmer Loop Owners Loop Phone #: ###-#### Inspection requested via web by Tom Betty Discussed medium voltage conductors installed through vaults,egress doors with panic hardware.
|
Electrical Rough-In | 2/12/2016 | 2/16/2016 | 2/16/2016 | A | PASS |
Rex Boyles
|
|
|
Contact Brandon Robinson for basement grease interceptor heat trace rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok bsmt. grease collector
|
Electrical Rough-In | 12/22/2015 | 12/22/2015 | 12/22/2015 | P | PASS |
Rex Boyles
|
|
|
Garage expansion electrical room 0B-125. Wall and ceiling cover inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok walls and ceilings
|
Electrical Rough-In | 12/16/2015 | 12/17/2015 | 12/17/2015 | P | PASS |
Rex Boyles
|
|
|
Garage Expansion, Room 121;122. Branch circuits Phone #: ###-#### Inspection requested via web by Tom Betty r/i walls ok
|
Conference | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | DONE |
Rex Boyles
|
|
|
AHU-2 disconnect clearance Phone #: ###-#### Inspection requested via web by Tom Betty discuss clearances for AH-2 controller in Bsmt. Maintain 50" in front of disconnect and 6' 6" from top of disc. for safe working area with 480 volt
|
Electrical Rough-In | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PASS |
Rex Boyles
|
|
|
OBG-114, OBG-134 Walls and Ceiling Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok including maintainence shop walls
|
Electrical Rough-In | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | PASS |
Rex Boyles
|
|
|
West side walls Phone #: ###-#### Inspection requested via web by Tom Betty Bsmt. west side rooms walls and ceilings with Z channel r/i ok to cover
|
Electrical Rough-In | 10/30/2015 | 10/30/2015 | 10/30/2015 | P | PASS |
Rex Boyles
|
|
|
Walls and Ceilings Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok main IT server rooms walls and ceilings in bsmt., Xformer room and MSB room walls and ceilings in bsmt. in SWH ok to fir out or cover
|
Electrical Rough-In | 10/16/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
Rex Boyles
|
|
|
Slab inspection Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok underground conduits at loading docks for dock levelers
|
Telephone call | | | 8/28/2015 | | DONE |
Rex Boyles
|
|
|
as per phone call with Rex Boyles- okay for temp occupancy
|
Conference | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | DONE |
Rex Boyles
|
|
|
Contact Tom Hartung for quetion on motor controller disconnecting means. Phone #: ###-#### Inspection requested via web by Tom Betty OK to install sump pump motor controller disconnects and motor controllers at locations shown, all capable of being locked out at disconnect and controllers as per NEC 430.102 (B)(b) for sump pump motors not directly in sight of controllers and disconnects.All controllers and disconnects and sump pump motors shall be labeled.
|
Electrical Rough-In | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Jef Flesching for garage roof deck rough in concrete. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok half green area of pour ok
|
Electrical Rough-In | 5/22/2015 | 5/26/2015 | 5/26/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Tpm Hartung for level 1 garage roof deck rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok parking ceiling orange area
|
Electrical Rough-In | 5/7/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Daryl DeGrange
|
|
|
Contact Tom Hartung for garage roof deck rough in concrete work. Phone #: ###-#### Inspection requested via web by Tom Betty Rough-in ok cover/pour west half green as per plans
|
Electrical Rough-In | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | PASS |
Daryl DeGrange
|
|
|
Call Tom Hartung for garage roof deck rough in. Phone #: ###-#### Inspection requested via web by Tom Betty rough-in ok Gold pour and portion of Teal
|
Electrical Rough-In | 4/17/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for roof deck rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab on deck in "blue" area of Tom's drawing
|
Electrical Rough-In | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for garage roof rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok HQ Peach area of slab on deck plan
|
Change Status to I | | | 4/13/2015 | | DONE |
|
|
|
Should be FNL. Should have been a rough in inspecation on 4-1
|
Final | 3/31/2015 | 4/1/2015 | 4/1/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for garage roof deck rough in inspection. Phone #: ###-#### Inspection requested via web by Tom Betty "slab on deck " for parking garage in baby blue area on inspection page
|
Electrical Rough-In | 3/18/2015 | 3/19/2015 | 3/19/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom hartung for garage roof rough in raceways. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab on deck parking garage ceiling (see Tom's new concrete pour plans -pink area today)
|
Electrical Rough-In | 3/5/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for roof deck concrete rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok continuation of parking garage roof
|
Electrical Rough-In | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underslab rough in work. Phone #: ###-#### Inspection requested via web by Tom Betty underslab 100% west end of site
|
Electrical Rough-In | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for grounding electrode under slab inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok 4/0 bare grounding electrode conductors and grid to pylon
|
Electrical Rough-In | 2/27/2015 | 3/2/2015 | 3/2/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underground rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok u.ground at mssa and mssb west end of project
|
Electrical Rough-In | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Mark Preston for garage roof rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i conduits in basement ceiing pour continuation ok see plans
|
Electrical Rough-In | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underground rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i u.ground continuation @ col.GA and E6 ok
|
Electrical Rough-In | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Mark Preston for garage roof deck rough in. Northeast area of project grade level. Phone #: ###-#### Inspection requested via web by Tom Betty continuation r/i basement ceiling branch circuit raceways and lights ok
|
Electrical Rough-In | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underground inspection in Northwest corner of site. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok u.ground continuation of 8-4" telco and 1-3" to ESSE up to E3
|
Electrical Rough-In | 2/5/2015 | 2/5/2015 | 2/5/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underslab work east of crane 3. Phone #: ###-#### Inspection requested via web by Tom Betty under slab conduits to G-6 , area A for sump pump pit and juice bars ok
|
Electrical Rough-In | 2/2/2015 | 2/3/2015 | 2/3/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underground rough in. Phone #: ###-#### Inspection requested via web by Tom Betty u.ground to electric rm. 125 6-3" conduits and 1-2". Also continuation of 3" for ESSE to col. line GD ok to cover.
|
Electrical Rough-In | 1/29/2015 | 1/29/2015 | 1/29/2015 | P | PASS |
Rex Boyles
|
|
|
Underground inspection west side of project. Contact Tom Hartung please. Phone #: ###-#### Inspection requested via web by Tom Betty r/i u.ground feeders to BDAA and EQBAA at col. GD and E4 ok to cover
|
Electrical Rough-In | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underground rough in west side of project. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok u.ground west side from generator north towards x-former 3 and 4 partial. see plans
|
Electrical Rough-In | 1/23/2015 | 1/26/2015 | 1/26/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Mark Preston for garage roof rough in on Northeast side of project. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok basement ceiling (n.east parking garage area) see EG-2-00-1 sheets
|
Electrical Rough-In | 1/22/2015 | 1/23/2015 | 1/23/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underground raceways. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok underground for 12.5KVA to transformer pads 3&4 . Also Core wall receptacle and 2 lights north side r/i ok
|
Final | 12/23/2014 | 12/23/2014 | 12/23/2014 | P | CANC |
Rex Boyles
|
|
|
Underground inspection on north end of project. Phone #: ###-#### Inspection requested via web by Tom Betty needed r/i
|
Electrical Rough-In | 12/23/2014 | 12/23/2014 | 12/23/2014 | P | PASS |
Rex Boyles
|
|
|
Underground inspection on north end of project. Phone #: ###-#### Inspection requested via web by Tom Betty r/i u.ground continuation of 8-4inch and 1-3 inch conduit up to column G-2 ok to cover
|
Electrical Rough-In | 12/19/2014 | 12/19/2014 | 12/19/2014 | P | PASS |
Rex Boyles
|
|
|
Talk to Tom Hartung Phone #: ###-#### Inspection requested via web by Tom Betty u.ground 8-4" telco and 1-3" em. conduit up to column G7 ok to cover
|
Electrical Rough-In | 12/17/2014 | 12/17/2014 | 12/17/2014 | A | PASS |
Rex Boyles
|
|
|
Contact Tom Hartung for underground raceway on far westside of project. Phone #: ###-#### Inspection requested via web by Tom Betty 12.5 5" primary r/i ok to column line GC
|
Electrical Rough-In | 12/8/2014 | 12/9/2014 | 12/9/2014 | P | PASS |
Rex Boyles
|
|
|
Contact Mark Preston for garage roof preconcrete pour rough in. Phone #: ###-#### Inspection requested via web by Tom Betty slab electrical above parking garage for luminaires and HR's (level one) r/i ok (see plans)
|
Issue PAID IN FULL permit | | | 12/2/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/2/2014 | | |
|
|
|
|
First Notice | 12/8/2016 | 12/8/2016 | | | |
Rock A. Hudson
|
|
|
|