Final | 2/1/2015 | 2/2/2015 | 2/2/2015 | P | PASS |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Chesnut Floor Heat final OK
|
Electrical Rough-In | 12/5/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Cevyn Recla
|
|
|
floor heat rough in. Thanks Phone #: ###-#### Inspection requested via web by Chris Chesnut Floor heat cable, RI OK to cover
|
Electrical Rough-In | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | CANC |
Cevyn Recla
|
|
|
Floor heat master bathroom Phone #: ###-#### >> Inspection requested via web by Chris Chesnut Inspection cancelled from web by: Chris Chesnut
|
Issue PAID IN FULL permit | | | 12/3/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/3/2014 | | DONE |
|
|
|
This permit was created on the web by Chris Chesnut
|