Final | 3/25/2015 | 3/26/2015 | 3/26/2015 | P | PASS |
Daryl DeGrange
|
|
|
Any questions please call Darrel Kubik ###-#### Phone #: ###-#### Inspection requested via web by Charmel Kubik final ok
|
Electrical Rough-In | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Cevyn Recla
|
|
|
Rough in inspection for floor heat - You can call Darrel Kubik @ ###-#### Phone #: ###-#### Inspection requested via web by Charmel Kubik Floor heat cable, upstairs master bath OK to cover
|
Rough-In Permanent Service | 12/17/2014 | 12/17/2014 | 12/17/2014 | A | PASS |
Cevyn Recla
|
|
|
Please call Darrel Kubik ###-#### - the contractor scheduled to have the cement delivered this morning at 10:00 am and would like to have the inspection done before it arrives. Thank you Phone #: ###-#### Inspection requested via web by Charmel Kubik Corrections made, RI OK poured ground wire in concrete, ok to cover, PS, UG, N, OK
|
Electrical Rough-In | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | CANC |
Cevyn Recla
|
|
|
Please call Darrel Kubik ###-####(ASAP). The contractor has scheduled to have the concrete poured at 10:00am and the inspection will need to be done before the concrete is poured.. Thank you Phone #: ###-#### Inspection requested via web by Charmel Kubik Called for 2 inspections, cancelled this one, see rough in permanent service
|
Electrical Rough-In | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | FAIL |
Cevyn Recla
|
|
|
Any questions, please call Darrel Kubik ###-#### Phone #: ###-#### Inspection requested via web by Charmel Kubik Phone number listed is non-working 300.4A1 Nm through bored holes shall have protection where edge of hole is less than 1 1/4 inch from edge of framing member
BCC all work shall be finished and ready for inspection, wire and box hanging directly from ceilning and not made up
|
Issue PAID IN FULL permit | | | 12/15/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/15/2014 | | DONE |
|
|
|
This permit was created on the web by Charmel Kubik
|