Final | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PASS |
Rex Boyles
|
|
|
19 solar panels. AC micro-inverter system. No DC voltage. Enphase M250 Micro-Inverters,that are CSA, IEEE-1547, and UL-1741 listed. And 270 watt Suniva panels, ETL listed. The solar panels are arranged in two different locations on the roof. So there are two strings that come into a solar combiner box in the garage, next to the main panel. This is properly labeled as a solar combiner box, and not a branch circuit sub panel. From there, a single circuit goes out to the knife switch, located next to the meter base. And from knife switch to the breaker in main panel located in the garage. The solar fed breaker is at the top of the busing, opposite the feeder lugs. The solar breaker,knife switch and combiner box are clearly marked for solar, and the circuit number identified in the knife switch and the panel schedule. The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service grounding electrode. This is visible via the access panel directly under the main panel.
The main panel is in the garage, so give the homeowner a call for access at 409.7549
Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King final ok
|
Issue PAID IN FULL permit | | | 12/26/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/26/2014 | | |
|
|
|
|