Final | 7/14/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Bob Reichert
|
|
|
Bath floor heat and heat lamps are on circuit # 28. Bath GFI outlets are on the original circuit # 5. The were not moved, just new trim. Phone #: ###-#### Inspection requested via web by Richard Corn ok final
|
Final | 7/10/2015 | 7/13/2015 | 7/13/2015 | P | FAIL |
Daryl DeGrange
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by Richard Corn Need to label bathroom receptacles and floor heat branch circuits in panel, provide manufactures literature for floor heat thermostat to verify class(A) GFCI protection
|
Electrical Rough-In | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PASS |
Bob Reichert
|
|
|
This is an inspection of the floor heat matt Phone #: ###-#### Inspection requested via web by Richard Corn ok cover bath floor heat
|
Electrical Rough-In | 6/24/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Richard Corn r/i ok new bathroom circuit to bathroom . Will need to look at floor heat after rough in of floor mat complete
|
Issue PAID IN FULL permit | | | 6/24/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/24/2015 | | DONE |
|
|
|
This permit was created on the web by Richard Corn
|