Electrical Rough-In | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Eric Story
|
|
|
6 solar panels. AC micro-inverter system. No DC voltage. Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed. Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs. And 270 watt Suniva panels, ETL listed.
Its a small system, with a 40 foot run of 10/3 romex ran from the solar array to the knife switch, located next to meter base. From the knife switch to breaker in main panel, at the top of the busing, opposite the feeder lugs. The solar breaker and the knife switch are permanently marked for solar, and the circuit numbers identified in the knife switch and on the panel schedule.
The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service grounding electrode in the main panel.
The array has already been installed, due to the fact it took two weeks to get the permits. I communicated with Tim Woodard concerning the work. Call me ahead of time, and I''ll arrange to meet you there in order to take up a panel and inverter for listing inspection. I''ll need a couple hours notice to get there and get it ready. Phone #: ###-#### Inspection requested via web by Ryan King verified listing and grounding rough-ok
|
Final | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | PASS |
Eric Story
|
|
|
6 solar panels. AC micro-inverter system. No DC voltage. Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed. Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs. And 270 watt Suniva panels, ETL listed.
Its a small system, with a 40 foot run of 10/3 romex ran from the solar array to the knife switch, located next to meter base. From the knife switch to breaker in main panel, at the top of the busing, opposite the feeder lugs. The solar breaker and the knife switch are permanently marked for solar, and the circuit numbers identified in the knife switch and on the panel schedule.
The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service grounding electrode in the main panel.
The array has already been installed, due to the fact it took two weeks to get the permits. I communicated with Tim Woodard concerning the work. Call me ahead of time, and I''ll arrange to meet you there in order to take up a panel and inverter for listing inspection. I''ll need a couple hours notice to get there and get it ready. Phone #: ###-#### Inspection requested via web by Ryan King final ok
|
Issue PAID IN FULL permit | | | 6/30/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/30/2015 | | DONE |
|
|
|
This permit was created on the web by Ryan King
|