Final | 7/20/2015 | 7/22/2015 | 7/22/2015 | A | PASS |
Eric Story
|
|
|
Hey Eric, Just a heads up, the home owner will not be home, so give me a call a couple hours before you head out, and I''ll meet you there. 850.8965
But here''s what you''ll be checking out -
10 solar panels. AC micro-inverter system. No DC voltage. Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed. Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs. And 275 watt Suniva panels, ETL listed.
A single home run, in metal conduit, is ran from the solar array to the knife switch, located next to meter base on west side of home. From the knife switch to breaker in main panel, at the bottom of the busing, opposite the feeder lugs. The solar breaker and the knife switch are permanently marked for solar, and the circuit numbers identified in the knife switch and on the panel schedule.
The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service grounding electrode in the main panel.
Thanks Phone #: ###-#### Inspection requested via web by Ryan King final for photovoltaic system ok
|
Electrical Rough-In | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Eric Story
|
|
|
Hey Eric, Just a heads up, the home owner will not be home, so give me a call a couple hours before you head out, and I''ll meet you there. 850.8965
But here''s what you''ll be checking out -
10 solar panels. AC micro-inverter system. No DC voltage. Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed. Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs. And 275 watt Suniva panels, ETL listed.
A single home run, in metal conduit, is ran from the solar array to the knife switch, located next to meter base on west side of home. From the knife switch to breaker in main panel, at the bottom of the busing, opposite the feeder lugs. The solar breaker and the knife switch are permanently marked for solar, and the circuit numbers identified in the knife switch and on the panel schedule.
The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service grounding electrode in the main panel.
Thanks Phone #: ###-#### Inspection requested via web by Ryan King rough-in for photovoltaic verified ul listing and grounding ok
|
Issue PAID IN FULL permit | | | 7/15/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/15/2015 | | |
|
|
|
|