Final | 10/1/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Rex Boyles
|
|
|
corey would like to meet you there to get this finaled he will call you and set up a time time to meet. Phone #: ###-#### Inspection requested via web by Don Lustig corrections made final ok
|
Final | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | FAIL |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Don Lustig GFCI test mode not functioning for floor heat
|
Final | 9/27/2015 | 9/28/2015 | 9/28/2015 | A | FAIL |
Rex Boyles
|
|
|
please final if possible call corey with questions thanks and sorry for the NR on friday Phone #: ###-#### Inspection requested via web by Don Lustig final ok except floor heat GFCI breaker not installed yet.
|
Final | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | NR |
Rex Boyles
|
|
|
call corey with questions thanks Phone #: ###-#### Inspection requested via web by Don Lustig needs monday insp. please call back in
|
Electrical Rough-In | 8/26/2015 | 8/27/2015 | 8/27/2015 | A | PASS |
Daryl DeGrange
|
|
|
floor heat rough in inspection call corey with questions thanks Phone #: ###-#### Inspection requested via web by Don Lustig CSA listed floor heat rough-in ok cover
|
Electrical Rough-In | 8/24/2015 | 8/24/2015 | 8/24/2015 | P | FAIL |
Eric Story
|
|
|
FLOOR HEAT - MARK Phone #: ###-#### STOP WORK FLOOR INSTALLED BE A NON-LICENSED ELECTRICIAN contacted cory at ###-#### explained the issue
|
Electrical Rough-In | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Rex Boyles
|
|
|
ready for rough in walls and ceiling Phone #: ###-#### Inspection requested via web by Don Lustig "Cory" r/i mstr. bdrm. ,bath and closet ok to cover
|
Issue PAID IN FULL permit | | | 8/4/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/4/2015 | | DONE |
|
|
|
This permit was created on the web by Don Lustig
|