Final | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PASS |
Rex Boyles
|
|
|
Call Mitch 30 minutes before. Phone #: ###-#### Inspection requested via web by Mitch Whited final ok
|
Fees Due Hold | 9/24/2015 | | 10/1/2015 | | DONE |
|
|
|
|
Electrical Rough-In | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Rex Boyles
|
|
|
Mitch Phone #: ###-#### r/i ok
|
Conference | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | DONE |
Rex Boyles
|
|
|
Mitch Phone #: ###-#### The entire electrical system shall be inspected and or tested by an electrical contractor after being compramised by utility line falling onto building. All damaged wiring shall be replaced and have a rough in inpection by the City of Boise prior to covering. All damaged devices and light fixtures shall be replaced also prior to final inspection. New electrical service already installed and ok to energize on this unit only.
|
Permanent Service | 8/23/2015 | 8/24/2015 | 8/24/2015 | A | PASS |
Bob Reichert
|
|
|
Lock box on door. Call Mitch at ###-#### for number. Phone #: ###-#### Inspection requested via web by Mitch Whited p/s u/g rec ok 1 unit only
|
Issue PAID IN FULL permit | | | 8/19/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/19/2015 | | DONE |
|
|
|
This permit was created on the web by Mitch Whited
|
First Notice | 10/15/2015 | 10/15/2015 | | | |
Rex Boyles
|
|
|
|