Final | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Eric Story
|
|
|
I am going to Donnelly so might not be able to answer phone but should be good to go bath is finished- except for gas line to dryer- added a fan and timer in 2nd bath where gfci is located - have installed 6 new circuits to this area - check panel on kitchen side for breakers Phone #: ###-#### Inspection requested via web by dennis mcneely both upstairs baths final ok
|
Electrical Rough-In | 12/14/2015 | 12/15/2015 | 12/15/2015 | A | PASS |
Eric Story
|
|
|
adding more floor heat need cvr inspection Phone #: ###-#### Inspection requested via web by dennis mcneely master bath floor heat ok cover
|
Electrical Rough-In | 11/12/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Eric Story
|
|
|
need cover on walls in new bath for master bd rm upstairs Phone #: ###-#### Inspection requested via web by dennis mcneely upstairs master bath ok cover
|
Electrical Rough-In | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Eric Story
|
|
|
need cover for floor heat in upstairs bath homeowner will be there Phone #: ###-#### Inspection requested via web by dennis mcneely upstairs master floor heat ok to cover
|
Issue PAID IN FULL permit | | | 9/15/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/15/2015 | | DONE |
|
|
|
This permit was created on the web by dennis mcneely
|