Final | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Bob Reichert
|
|
|
access 1122 Phone #: ###-#### Inspection requested via web by David Nelson corrections made, ok final
|
Final | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | FAIL |
Eric Story
|
|
|
access 0222 Phone #: ###-#### Inspection requested via web by David Nelson 406.4(b) receptacles shall have equipment grounding conductor BCO 4-05-32 lighting in closets shall be completly enclosed
|
Electrical Rough-In | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PASS |
Rock A. Hudson
|
|
|
Access 1122, sheetrock not installed so no need for extra consultation Phone #: ###-#### Inspection requested via web by David Nelson Kitchen area and stair to basement rough in ok cover
|
Permanent Service | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | PASS |
Eric Story
|
|
|
re-connecting power after fire as per consultation with Eric Phone #: ###-#### Inspection requested via web by David Nelson p/s o/h rec ok
|
Conference | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | DONE |
Eric Story
|
|
|
call ###-#### to set up conference and access Phone #: ###-#### Inspection requested via web by David Nelson discussed rewiring areas due to fire damage and bringing grounding up to code to re-energize. existing panel ok to stay contractor will most likely build a platform in front of it for height requirements.
|
Issue PAID IN FULL permit | | | 12/3/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/3/2015 | | DONE |
|
|
|
This permit was created on the web by David Nelson
|