Final | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Bob Reichert
|
|
|
Jose Phone #: ###-#### ok final, signed card
|
Final | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PART |
Bob Reichert
|
|
|
Jose Phone #: ###-#### shall move east dock leveler panel for clearance per NEC 110.26, rest ok, will recall later, no card to sign
|
Telephone call | | | 3/15/2016 | | DONE |
|
|
|
called Mary Ann to let know that the 3 phases of this project have 3 different building permits so 3 different electrical permits will need to be pulled for the 3 different phases. She will need to ask for a refund since they put the total valuation for a 3 phases on this permit
|
Electrical Rough-In | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | CANC |
Rock A. Hudson
|
|
|
Jose Phone #: ###-#### Needed conference
|
Conference | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | DONE |
Rock A. Hudson
|
|
|
Jose Phone #: ###-#### Discussed required grounding electrode system for new fire pump service. They poured and concrete encased in floor of new fire pump room. Shall use all available grounding electrodes. Fire pump underground metal piping system, concrete encased, contractor to ensure main service grounding electrode system bonds to fire sprinkler piping system to tie all together.
|
Electrical Rough-In | 2/22/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Bob Reichert
|
|
|
Jose Phone #: ###-#### ok cover fire pump room
|
Electrical Rough-In | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | PASS |
Bob Reichert
|
|
|
Underground r/i, please call ahead for access - Jose Phone #: ###-#### south side u/g for fire pump ok from west side to dock area east side ok cover
|
Electrical Rough-In | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Rock A. Hudson
|
|
|
underground // Jose Phone #: ###-#### Discussed the route for service entrance conductors for fire pump. Due to route outside of building will set a traffic rated concrete pull box in ground about center of south side near walkway. Conductors to be over sized for voltage drop. Path across ramp to be encased in concrete for traffic on ramp. Underground from south east corner to mid way on ramp only rough in ok cover
|
Issue PAID IN FULL permit | | | 1/21/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/21/2016 | | DONE |
|
|
|
This permit was created on the web by Kevin Perez
|
First Notice | 4/6/2016 | 4/6/2016 | | | |
Bob Reichert
|
|
|
|