Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberELE16-00303
StatusFinaled
Name POWER PLUS INC
Site Address 777 W MAIN ST Unit: 150
Project Name 
Customer Number1400
ePlanReviewNo
Description
Alteration: All Elec. for the BSU T.I. @ City Center Plaza.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/6/2017 DONE
First Notice10/31/201610/31/201611/2/2016 DONE
DetailsEric Story
This permit finaled on the web by Debby Pierce
Final10/31/201610/31/201610/31/2016APASS
DetailsEric Story
Final. Contact is Mark Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
Floors 2@3 Final ok, signed sign off sheet
Final8/4/20168/4/20168/4/2016PPART
DetailsRock A. Hudson
###-#### TCO BSU floors 2 and 3
Temp final ok
Electrical Rough-In8/4/20168/4/20168/4/2016ANR
DetailsRock A. Hudson
TCO for floors 2 and 3. BSU stairway has lighting installed. Contact is Eric Gibson ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves
3rd floor server room door needs to be lockable, install panel in door and locks. Complete center stair lighting and blank off all boxes. Room 368 still has connection issues, wrong whip.
Electrical Rough-In8/1/20168/2/20168/2/2016APART
DetailsRock A. Hudson
TCO inspection.
Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
Floor 2- complete central stair lighting. Framing at main floor entrance, sconce omitted, flourescent under landings not installed may be omitted. Covers missing for card readers on several walls. Cover gutter i electrical room.
3rd floor- Server room fire suppression, HVAC, rack yet to complete. Door shall be lockable and missing window. Card reader boxes at several locations not covered. Room 368 conference table power supply not compatible with floor box provided. location different. Armored cable whip provided and receptacle installed in floor.
Electrical Rough-In7/28/20167/29/20167/29/2016ACANC
DetailsRock A. Hudson
Inspect wall trim out on 2nd and 3rd floor. Inspect for remaining items needed for a TCO for this TI space. Contact is Toby Groves ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves
Prewalk floors 2 and 3 ok for furniture. Thank you. Check corridor and stair lighting on both floors, remove flexible cord for temp power on 2, open boxes server rm, elec rm, 341, switch cover 342, west patio can trims, 3rd conference rm circiut inop, 368 furniture whip.
Electrical Rough-In7/28/20167/28/20167/28/2016PPASS
DetailsRock A. Hudson
Ceiling inspection 2nd and 3rd floor. Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves Grid complete floors 2 and 3 rough in ok cover
Electrical Rough-In7/27/20167/27/20167/27/2016PPART
DetailsRock A. Hudson
Ceiling cover inspection where available. Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
Grid as noted on contractor print for levels 2 and 3 rough in ok cover. areas not ready are 353, 358, 363, 221 240, 241, 242, 243, open area north side fixture whip.
Electrical Rough-In7/22/20167/22/20167/22/2016PPART
DetailsRock A. Hudson
Grid ceiling cover inspection floors 2 and 3.Not all rooms are ready, but would like to get as many as we can inspected.Contact is Eric Gibson ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves
Grid 2nd floor 245 thru 251, 254 thru 258. Boarder as noted on contractor print only.
Grid 3rd floor open offices 325, 326, rms 340, 350, 354, 355, 356, 358, 360, 366, 367. Boarders as noted on contractor print rms 351, 352, 363, 368. Areas noted rough in ok cover
Electrical Rough-In5/26/20165/26/20165/26/2016PPASS
DetailsRock A. Hudson
BSU TI stairway. 3rd floor ceiling for cover. Contact is Eric Gibson 871 -1363 Phone #: ###-#### Inspection requested via web by Toby Groves
discussed door location in 2nd floor electrical room. With 45" width to get to door Chief Electrical inspector ruled unobstructed egress to door was sufficient. Grid 3rd floor stairway rough in ok cover. Book not at desk to mark as inspected.
Electrical Rough-In5/25/20165/25/20165/25/2016PPASS
DetailsRock A. Hudson
3rd floor wall rough in for cover BSU T.I. Contact is Eric Gibson ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves
Perimeter walls accept wall to stair platform not present. Rough in ok cover
Electrical Rough-In4/15/20164/15/20164/15/2016PPASS
DetailsRex Boyles
2nd and 3rd floor wall inspection. Contact is ERIC Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves r/i ok 3rd floor walls see blue area on plans
Electrical Rough-In4/13/20164/13/20164/13/2016PPASS
DetailsRex Boyles
Can light inspection for cover in bathroom. Eric Gibson is the Contact ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves r/i ok BSU co ed bath ceiling on 2nd flr
Electrical Rough-In4/8/20164/8/20164/8/2016PPASS
DetailsRex Boyles
Can lights in ceiling cover inspection. Contact is Eric Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves r/i vending machine rm. ceiling can lights ok
Electrical Rough-In4/5/20164/5/20164/5/2016PPASS
DetailsRock A. Hudson
Wall cover inspection 3rd floor Phone #: ###-#### Inspection requested via web by Toby Groves
Walls marked in green only rough in ok cover
Electrical Rough-In4/1/20164/1/20164/1/2016PPASS
DetailsDaryl DeGrange
Cover inspections for walls Phone #: ###-#### Inspection requested via web by Toby Groves Rough-in ok cover interior walls highlighted green and dated
Conference3/9/20163/9/20163/9/2016ADONE
DetailsRex Boyles
Need to verify working clearances for HVAC control boxes above ceilings. Phone #: ###-#### Inspection requested via web by Toby Groves 110.26(A)(1)- Working space for equipment operating at 600 volts or less to ground and likely to require examination, adjustment,service or maintenance while energized shall comply with the deminsions 0f 110.26(A)(1),(A)(2) and (A)(3)
Electrical Rough-In3/9/20163/9/20163/9/2016PPASS
DetailsRex Boyles
Need to verify working clearances for HVAC control boxes above ceilings. Phone #: ###-#### Inspection requested via web by Toby Groves r/i ok exterior walls on stairwell 3 between parking structure and city center bldg. level 1 thru 4.
Electrical Rough-In3/2/20163/2/20163/2/2016PPASS
DetailsRex Boyles
Rough in cover inspection. Catch up on inspection binder Phone #: ###-#### Inspection requested via web by Toby Groves Just update ESI binder no r/i insp.
Electrical Rough-In2/25/20162/25/20162/25/2016APASS
DetailsRex Boyles
Cover inspection 2nd and 3rd floors East side of building. Phone #: ###-#### Inspection requested via web by Toby Groves partial walls ok see Eric"s E1.2.1 and E.1.3.1 sheets for pink areas only.
Electrical Rough-In2/16/20162/16/20162/16/2016PPASS
DetailsRex Boyles
Exterior wall cover inspection level 3. Phone #: ###-#### Inspection requested via web by Toby Groves 100% r/i ok exterior walls on 3
Final2/12/20162/12/20162/12/2016PCANC
DetailsRex Boyles
Cover inspection exterior walls. Phone #: ###-#### Inspection requested via web by Toby Groves needed r/i insp
Electrical Rough-In2/12/20162/12/20162/12/2016PPASS
DetailsRex Boyles
Cover inspection exterior walls. Phone #: ###-#### Inspection requested via web by Toby Groves r/i exterior walls on level 2 ok. r/i exterior walls level 3 east wall only
Issue PAID IN FULL permit  2/1/2016 DONE
Payment received via Govolutions
Owner Supplied Equipment  2/1/2016  
Application received  2/1/2016 DONE
This permit was created on the web by Debby Pierce