Final | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by shane miller final ok
|
Final | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | PART |
Eric Story
|
|
|
power disconnect and reconnect is scheduled 4:11 o''clock AM after that would be best for a final Phone #: ###-#### Inspection requested via web by shane miller detached shop only ok, mudt verify grounded and grounding conductor seperated at house panel and a second ground rod driven
|
Electrical Rough-In | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by shane miller
|
Rough-In Permanent Service | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by shane miller u/g from detached garage to house ok cover detached garage ok cover p/s o/h rec ok
|
Issue PAID IN FULL permit | | | 2/16/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/16/2016 | | DONE |
|
|
|
This permit was created on the web by shane miller
|