Print Statement | | | 3/30/2017 | | DONE |
|
|
|
|
Final | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PASS |
Eric Story
|
|
|
Please provide a final inspection at the Buffalo Wild Wings TI. Rod with Steed Construction should be on site and will be your contact there. His number is ###-####. Phone #: ###-#### Inspection requested via web by Kevin Perez as per rock hudson all other areas were fine. correction fixed, installed GFCI breakers for bar area. final ok.
|
Final | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Ben Phone #: ###-#### 210.8- Receptacles located with in 6' of a sink shall have GFCI protection. Bar area and near water heater. Critical systems related to core and shall be operational prior to final.
|
Electrical Rough-In | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling; Zach Phone #: ###-#### rough-in ok cover kitchen ceiling grid
|
Conference | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | DONE |
Rock A. Hudson
|
|
|
Ben Phone #: ###-#### Discussed transformer location above gear 1/2 in and out of grid. Wire rack for storage to be removed to the wid of transformer to provide required work space as per 110.26. With grid 2" in front of transformer cover is removable according to Ben. With gear over 800 amps door to left within 25' shall have panic hardware installed.
|
Conference | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | DONE |
Rex Boyles
|
|
|
Ben Phone #: ###-#### discuss transformer mounted halfway in and half way out of hardlid ceiling, also 480 volt conductors passing thru 208 volt section to get to x-former, also using 3 pole breakers for single phase branch circuits. Will get back to Ben asap
|
Electrical Rough-In | 4/21/2016 | 4/22/2016 | 4/22/2016 | P | PASS |
Rex Boyles
|
|
|
Kevin Phone #: ###-#### r/i ok 100% on walls, showwindows, (including pony walls)and bath ceilings also ok
|
Conference | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | DONE |
Rex Boyles
|
|
|
Ben Phone #: ###-#### discuss working clearances for HVAC VAV's asked TVR to attempt to relocate controller if possible, if not raise up to maintain as much clearance as possible above beverage station
|
Electrical Rough-In | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Rex Boyles
|
|
|
Ben Phone #: ###-#### r/i walls ok see Arch. sheets highlighted areas
|
Conference | 3/22/2016 | 3/23/2016 | 3/23/2016 | P | DONE |
Rex Boyles
|
|
|
Dan Phone #: ###-#### discuss 240.24 height requirements for Main disconnect . 240.24(A)-calls for 6' 7" maximum. Panelboard rough in can is as low as can be with 4" lip for wash down health dept. requirement. Can't meet code requirement. Told Ben we willlook into this more.
|
Issue PAID IN FULL permit | | | 3/18/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/18/2016 | | DONE |
|
|
|
This permit was created on the web by Kevin Perez
|
First Notice | 8/9/2016 | 8/9/2016 | | | |
Eric Story
|
|
|
|