Final | 9/19/2016 | 9/20/2016 | 9/20/2016 | A | PASS |
Eric Story
|
|
|
Andrea Phone #: ###-#### Final for master bed and bath ok
|
Electrical Rough-In | 5/2/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Eric Story
|
|
|
Brett Phone #: ###-#### master bed and bath ok cover
|
Electrical Rough-In | 4/27/2016 | 4/28/2016 | 4/28/2016 | P | CANC |
Eric Story
|
|
|
Brett Phone #: ###-#### needed conference
|
Conference | 4/28/2016 | 4/28/2016 | 4/28/2016 | P | DONE |
Eric Story
|
|
|
Brett Phone #: ###-#### discussed making up grounds in boxes and supporting of wires
|
Conference | 4/11/2016 | 4/14/2016 | 4/14/2016 | A | DONE |
Eric Story
|
|
|
Andrea Phone #: ###-#### discussed wall spacing and receptacle requirements alos all requirements for bathroom and AFCI @ GFCI protection as required by NEC
|
Conference | 3/25/2016 | 3/29/2016 | 3/29/2016 | A | CANC |
Eric Story
|
|
|
Andrea Phone #: ###-####
|
Application received | | | 3/25/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/25/2016 | | DONE |
|
|
|
|