First Notice | 5/11/2016 | 5/11/2016 | 5/24/2016 | | DONE |
Bob Reichert
|
|
|
This permit finaled on the web by Scott Campbell
|
Final | 5/10/2016 | 5/11/2016 | 5/11/2016 | P | PASS |
Bob Reichert
|
|
|
Thanks, Tony Phone #: ###-#### Inspection requested via web by Scott Campbell ok final
|
Conference | 5/9/2016 | 5/9/2016 | 5/9/2016 | A | PASS |
Eric Story
|
|
|
AM or PM your choice. Thanks, Jesse Phone #: ###-#### Inspection requested via web by Scott Campbell discussed what is needed for final. labeling PV circuits in ground boxes and moving breaker for PV system in panel to bottom spaces. also replacing wire connectors in ground boxes to listed connnectors for location.
|
Conference | 5/6/2016 | 5/6/2016 | 5/6/2016 | A | DONE |
Eric Story
|
|
|
Would you mind giving me a call about the solar wiring issues this morning? Thanks, Jesse ###-#### Phone #: ###-#### Inspection requested via web by Scott Campbell discussed code requierements for solar for back fed systems and seperation of conductors
|
Final | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | FAIL |
Eric Story
|
|
|
Please call in advance, will meet you at the site. Thanks, Tony Phone #: ###-#### Inspection requested via web by Scott Campbell 110.14(b) wire connectors or splices shall be listed for direct burial 690.31(b) PV source circuits shall not be contained in the same j-box as non-PV systems
|
Electrical Rough-In | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | PASS |
Bob Reichert
|
|
|
Underground Please. Thanks, Tony Phone #: ###-#### Inspection requested via web by Scott Campbell ok cover u/g from building to east light
|
Electrical Rough-In | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Bob Reichert
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by Scott Campbell ok cover u/g from panel to external pole mounted lights
|
Electrical Rough-In | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Bob Reichert
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by Scott Campbell ok cover u/g going east from west light toward central area before building with power
|
Electrical Rough-In | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PART |
Bob Reichert
|
|
|
Underground inspection please. Thanks Phone #: ###-#### Inspection requested via web by Scott Campbell 1st pole west going east ok to cover
|
Issue PAID IN FULL permit | | | 3/29/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/29/2016 | | DONE |
|
|
|
This permit was created on the web by Scott Campbell
|