Case Summary (ELE) | | | 12/27/2016 | | DONE |
|
|
|
|
First Notice | 5/3/2016 | 5/3/2016 | 11/17/2016 | | DONE |
Rex Boyles
|
|
|
as per GC electrical valuation that was paid for both ele permits was $3113.00. As per Dan with Mountain Valley Electric ELE15-03516-they did not get paid for the part of the work they did-Tri-State took over job after the rough in
|
Final | 5/2/2016 | 5/3/2016 | 5/3/2016 | A | PASS |
Rex Boyles
|
|
|
Contact: Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden final ok
|
Permanent Service | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | PASS |
Rex Boyles
|
|
|
Contact: Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden p/s u/g n ok existing service, add 1 phase meter to 3 phase system. available fault current for existing service exceeds AIC rating.
|
Final | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | CANC |
Rex Boyles
|
|
|
Contact: Derrick Kamper Phone #: ###-#### >> Inspection requested via web by Deb Gooden Inspection cancelled from web by: Deb Gooden
|
Final | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | CANC |
Rex Boyles
|
|
|
final for permanent service. Your contact name will be Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden needed r/i p/s
|
Electrical Rough-In | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Rex Boyles
|
|
|
final for permanent service. Your contact name will be Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden new 100amp service ,feeder and loadcenter ok NOTE:need available fault current label on new main disconnect as per NEC 110.24 and re label all services with addresses service 1 of 5,service 2 of 5 and so on for fire dept. prior to energizing new service.
|
Issue PAID IN FULL permit | | | 4/12/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/12/2016 | | DONE |
|
|
|
This permit was created on the web by Deb Gooden
|