Final | 7/26/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Eric Story
|
|
|
Zahid Phone #: ###-#### final for shop ok
|
Electrical Rough-In | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PASS |
Eric Story
|
|
|
Zahid Phone #: ###-#### Will need to verify main disc. means for seperate structure. Detached garage ok cover
|
Conference | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | DONE |
Eric Story
|
|
|
Zahid Phone #: ###-#### Discussed wiring and disc in detached garage and other NEC requirements
|
Electrical Rough-In | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Eric Story
|
|
|
underground; Zahid Phone #: ###-#### underground from house to shop ok cover
|
Conference | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | DONE |
Rock A. Hudson
|
|
|
Zahid Phone #: ###-#### discussed wiring to shed, 30amp feed for welder and light and receptacle. Conduit pre installed under driveway OK will dig to 18" as soon as possible after leaving concrete and maintain depth to shed. GFCI protection of receptacles and disconnect on interior of shed in wall OK. Need to remind of tamper
|
Application received | | | 4/13/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/13/2016 | | DONE |
|
|
|
|