ELE-Aging Inspection | 6/10/2020 | 6/10/2020 | 6/10/2020 | | PASS |
Mark Moncarr
|
|
|
Seperate permitt was pulled for this address by Sublime Elec. Corrections were made, and they also roughed in bonus room that should be up for a final here soon
|
Final | 6/10/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Mark Moncarr
|
|
|
Sublime Elec pulled permit and finished areas of house that needed corrections. Corrections were made. They also roughed in bonus room. Final should be coming soon
|
Final | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | FAIL |
Mark Moncarr
|
|
|
Taylor Phone #: ###-#### 1. AC whips need THHN, romex used right now. 2. 2nd AC has non-rated outdoor wiring. 3. Identify neutrals as hot wires in AC disconnects, also max fuse for AC installed is 25a. A 30a brkr is installed right now. 4. No GFI protection in garage. 5. Spark rings needed in all backsplash locatations. 6. GFI protection needed on back of kitchen island facing living. 7. Weather proof on back patio cannot be on with kitchen appliance circuit. 8. All bedroom lights need GFI protection. Verify smoke detectors are on ARC fault circuit. 9. Boxes in bonus need cover plates and lights need installed a long with stairwell. 10. 14-3 in bonus above panel needs installed in a box with wire nuts and blanked off. A licensed electrical contractor needs to be hired to complete all corrections. Posted notices on front window.
|
Meeting | | | 3/11/2020 | | DONE |
|
|
|
Bob okay no fee on this permit ok to schedule final since it was still in ISS status and it just needs the final inspection
|
ELE-Aging Inspection | 1/1/2020 | 1/1/2020 | 1/6/2020 | | DONE |
Mark Moncarr
|
|
|
|
ELE-Aging Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | | FAIL |
Mark Moncarr
|
|
|
Schedule a final inspection.
|
ELE-Aging Inspection | 6/5/2019 | 6/5/2019 | 6/11/2019 | | DONE |
Mark Moncarr
|
|
|
Please schedule a final inspection
|
ELE-Aging Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | | DONE |
Mark Moncarr
|
|
|
Called and left message on 3/5/19 at 11:35. Expressed the need for a final inspection.
|
Electrical Rough-In | 2/22/2017 | 2/22/2017 | 2/22/2017 | P | PASS |
Mark Moncarr
|
|
|
Scott Phone #: ###-#### ok cover
|
Permanent Service | 2/22/2017 | 2/22/2017 | 2/22/2017 | P | PASS |
Mark Moncarr
|
|
|
Scott Phone #: ###-#### p/s o/h n ok
|
Conference | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | DONE |
Mark Moncarr
|
|
|
Scott Phone #: ###-#### Questions involving panel and misc. throughout house.
|
Electrical Rough-In | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Eric Story
|
|
|
underground; Scott Phone #: ###-#### u/g for well ok cover
|
Application received | | | 4/14/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/14/2016 | | DONE |
|
|
|
|