Final | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Mark Moncarr
|
|
|
Swimming pool electrical. Pool access on far left side of residence, equipment on far right side of residence Phone #: ###-#### Inspection requested via web by Lars Johnson
|
Electrical Rough-In | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PASS |
Mark Moncarr
|
|
|
EQ bonding plane wiring. Bonded (3) window/door frames and left one tail for possible future railing at stairs at deep end of pool Phone #: ###-#### Inspection requested via web by Lars Johnson bonding ok
|
Conference | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | DONE |
Rock A. Hudson
|
|
|
Discussed with pool company grounding requirements for a aluminum drain cap for perimeter drain located less than 5' of waters edge. Bonding required due to location and metallic.
|
Electrical Rough-In | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Eric Story
|
|
|
Underground for (3) LV pool lights Phone #: ###-#### Inspection requested via web by Lars Johnson Underground for pool lights ok cover
|
Electrical Rough-In | 4/25/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Eric Story
|
|
|
Underground/bonding Phone #: ###-#### Inspection requested via web by Lars Johnson underground and equipentential bond ok cover
|
Issue PAID IN FULL permit | | | 4/25/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/25/2016 | | DONE |
|
|
|
This permit was created on the web by Lars Johnson
|