Final | 6/16/2016 | 6/17/2016 | 6/17/2016 | A | PASS |
Daryl DeGrange
|
|
|
overhead power for pump located in front east corner. corrections done Phone #: ###-#### Inspection requested via web by daniel bibikov final ok
|
Final | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov 430.109(b) only motors that are less then 1/8 HP shall use OCPD as means of disconnecting 356.12 LFNC shall not be used where subject to physical damage
|
Final | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | NR |
Daryl DeGrange
|
|
|
new overhead service for future water pump. its located in the front south east corner. Phone #: ###-#### Inspection requested via web by daniel bibikov not ready for final at this, power connection required to test GFCI device
|
Permanent Service | 5/4/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Daryl DeGrange
|
|
|
new overhead service for future water pump. its located in the front south east corner. Phone #: ###-#### Inspection requested via web by daniel bibikov p/s o/h n ok
|
Issue PAID IN FULL permit | | | 5/3/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/3/2016 | | DONE |
|
|
|
This permit was created on the web by daniel bibikov
|