Final | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Reames Final ok
|
Final | 6/15/2016 | 6/17/2016 | 6/17/2016 | P | CANC |
Eric Story
|
|
|
Attempting to schedule rough-in/final inspection on hot tub portion around same time. Phone #: ###-#### Inspection requested via web by Steven Reames needed r/i and not ready at this time
|
Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Eric Story
|
|
|
Attempting to schedule rough-in/final inspection on hot tub portion around same time. Phone #: ###-#### Inspection requested via web by Steven Reames underground for pool ok cover
|
Permanent Service | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Eric Story
|
|
|
Steven Phone #: ###-#### p/s u/g rec ok
|
Conference | 5/18/2016 | 5/20/2016 | 5/20/2016 | P | DONE |
Eric Story
|
|
|
Would like to meet around 1:30 PM if possible for conference walk through. Preferable to walk through with Rock Hudson as we have already talked through this when I did my first permit to add hot tub. Phone #: ###-#### Inspection requested via web by Steven Reames discussed service hange requirments and grounding also seperating grounded and grounding conductor in remote panel/also discussed not running type NM cable on exterior of house in conduit
|
Issue PAID IN FULL permit | | | 5/18/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/18/2016 | | DONE |
|
|
|
This permit was created on the web by Steven Reames
|