Final | 8/7/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
James Ady
|
|
|
I will not be on site. Call with any questions. Phone #: ###-#### Inspection requested via web by Garrett Collins Final ok
|
Electrical Rough-In | 7/10/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
James Ady
|
|
|
in floor heat inspection. general contractor to be on site. Phone #: ###-#### Inspection requested via web by Garrett Collins Remodel is back side of house. SW Corner Master floor heat. Ok to cover.
|
Electrical Rough-In | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Eric Story
|
|
|
GC will be on site. call with any questions. Phone #: ###-#### Inspection requested via web by Garrett Collins Master bed and bath ok cover
|
Issue PAID IN FULL permit | | | 5/26/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/26/2016 | | DONE |
|
|
|
This permit was created on the web by Garrett Collins
|