Final | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PASS |
Daryl DeGrange
|
|
|
Jose-phase 3-please call when get there so Jose can meet you Phone #: ###-#### final ok
|
Electrical Rough-In | 8/8/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
Bob Reichert
|
|
|
Jose Phone #: ###-#### ok cover ceiling, phase 3
|
Electrical Rough-In | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Daryl DeGrange
|
|
|
Jose Phone #: ###-#### Rough-in ok cover walls and UL listed floor boxes
|
Issue PAID IN FULL permit | | | 6/7/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/7/2016 | | DONE |
|
|
|
This permit was created on the web by Kevin Perez
|