Final | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn
corrections made...ok to final
|
Final | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn
breaker lockouts need installed on following circuits....kitchen hood, shop water heater,steam shower
pipe feeding shop power needs strapped
all openings in bedroom need arc fault protection-mst bed patio lights switch
outlets in kitchen cabinst need installed with proper spark protection
|
Electrical Rough-In | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | PASS |
Eric Story
|
|
|
Rough floor heat inspection Phone #: ###-#### Inspection requested via web by Darryn Coburn master bath floor heat ok cover
|
Electrical Rough-In | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | CANC |
Eric Story
|
|
|
Floor Heat Inspection Phone #: ###-#### >> Inspection requested via web by Darryn Coburn Inspection cancelled from web by: Darryn Coburn
|
Rough-In Permanent Service | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Eric Story
|
|
|
This is the inspection for the Shop. Phone #: ###-#### Inspection requested via web by Darryn Coburn detached garage ok cover
|
Rough-In Permanent Service | 7/13/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn rough-in ok cover p/s u/g n ok
|
Issue PAID IN FULL permit | | | 7/7/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/7/2016 | | DONE |
|
|
|
This permit was created on the web by Darryn Coburn
|