Final | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PASS |
Rock A. Hudson
|
|
|
Replace the existing pylon display with a new monument display. Phone #: ###-#### Inspection requested via web by Ken Olsen corrections made. Final ok
|
Final | 11/9/2016 | 11/10/2016 | 11/10/2016 | A | FAIL |
Rock A. Hudson
|
|
|
Replace existing monument sign with new sign. All Primary power to remain as is. Phone #: ###-#### Inspection requested via web by Ken Olsen 600.3- Sign is reuired to be listed. Unable to verify. 600.4- Sign shall be marked with manufacturer, trademark, voltage, and current. Unable to verify. 600.6(A)(1)- A disconnecting means shall be located where branch circuit enters sign. Unable to verify. Verbal over phone with contractor.
|
(F) Reprint permit | | | 8/18/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/18/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/17/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 16 2016 1:52PM
|
First Notice | 2/3/2017 | 2/3/2017 | | | |
Rock A. Hudson
|
|
|
|