Permit NumberELE16-02744
StatusFinaled
Name CONNECT BUILDING SERVICES INC
Site Address 2964 E PARKCENTER BLVD
Project NameArboretum at Barber Station #3
Customer Number92063
ePlanReviewNo
Description
New: Electrical for new construction club house-to include street lights and to include all underground pipework-multi family portion to be pulled on a different permit
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/28/20177/28/20177/28/2017PPART
DetailsJames Ady
Lower clubhouse and corrections on appartment level Phone #: ###-#### Inspection requested via web by Harley Woodward GFCI protect drinking fountain, hood wire, Spark ring kitchen, RCR50 on transformer cord in com room Blanks on 4sq in fire riser room and 2 Single gang next to house panels.
Final7/28/20177/28/20177/28/2017PPASS
DetailsJames Ady
Lower clubhouse and corrections on appartment level Phone #: ###-#### Inspection requested via web by Harley Woodward Corrections made Final ok
Electrical Rough-In7/12/20177/12/20177/12/2017PPASS
DetailsJames Ady
Pool steel bonding connections for equipotental loop Phone #: ###-#### Inspection requested via web by Harley Woodward Corner bonding only ok to cover
Final7/6/20177/7/20177/7/2017ANR
DetailsJames Ady
Ken Phone #: ###-#### not ready
Final7/6/20177/6/20177/6/2017PFAIL
DetailsJames Ady
Chris Phone #: ###-#### Job General calling in inspections for Sub contractors. Job Not ready for final.
Permanent Service6/8/20176/8/20176/8/2017PPASS
DetailsJames Ady
Power to panel for clubhouse meter cluster Phone #: ###-#### Inspection requested via web by Harley Woodward p/s u/g n ok 8 meters
Electrical Rough-In6/1/20176/2/20176/2/2017APASS
DetailsJames Ady
Club house loby ceilings rough electrical Phone #: ###-#### Inspection requested via web by Harley Woodward Ceiling only ok to cover
Electrical Rough-In5/30/20175/31/20175/31/2017PPASS
DetailsJames Ady
Above metal frame cielings inspection for rough electrical Phone #: ###-#### Inspection requested via web by Harley Woodward rough in ceiling only ok cover
Electrical Rough-In5/15/20175/16/20175/16/2017APASS
DetailsJames Ady
Am if possible. Just bathroom cielings in lower clubhouse level. Thanks. Phone #: ###-#### Inspection requested via web by Harley Woodward Bathrooms only Ceiling only ok to cover
Electrical Rough-In5/9/20175/10/20175/10/2017APASS
DetailsJames Ady
Apartments above clubhouse, light boxes in metal framed cielings. 6 units. Phone #: ###-#### Inspection requested via web by Harley Woodward 6 apartments, Laundry room ceiling only ok to cover
Electrical Rough-In4/27/20174/27/20174/27/2017PPASS
DetailsJames Ady
Stairwell rough electrical Phone #: ###-#### Inspection requested via web by Harley Woodward Stair well ok to cover
Electrical Rough-In4/12/20174/12/20174/13/2017PPASS
DetailsJames Ady
Morgan Phone #: ###-#### NW half 3rd floor ok to cover
Electrical Rough-In4/6/20174/7/20174/7/2017PFAIL
DetailsJames Ady
Main floor club house electrical rough in, excluding yoga studio ceiling, wall mounted meter section and adjacent room, and stairwells. ( sorry- superintendent pushing to insulate as much as possible) Phone #: ###-#### Inspection requested via web by Harley Woodward Too many items unfinished, multiple nail plates, unstuffed boxes,
Electrical Rough-In4/6/20174/6/20174/6/2017PPART
DetailsJames Ady
Chris-3 walls on main floor Phone #: ###-#### ok to cover
Telephone call  3/20/2017 DONE
Talked to Ken-they will pull a permit for the residential partions of this building-I told him he would have to pull the permit like we would for a new SFD but put 6 in the units
Electrical Rough-In3/9/20173/10/20173/10/2017APASS
DetailsJames Ady
1-6; chris Phone #: ###-#### 2nd floor only Rough in ok
Electrical Rough-In10/5/201610/6/201610/6/2016APASS
DetailsRock A. Hudson
Alex Phone #: ###-####
Reinspect pole base damaged and redone. South east pole base. Rough in ok cover
Electrical Rough-In8/30/20168/31/20168/31/2016APASS
DetailsBob Reichert
Alex-unbderground for pole lights Phone #: ###-#### ok u/g for site lighting less 1 pole base to be re-inspected
Issue PAID IN FULL permit  8/30/2016 DONE
Application received  8/23/2016 DONE
This permit was created on the web by Kenneth Chapman
First Notice7/28/20177/28/2017   
DetailsJames Ady