Final | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | PASS |
Rock A. Hudson
|
|
|
For access please call Joe 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Final ok
|
Final | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | FAIL |
James Ady
|
|
|
For access please call Joe 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Floor heat installed withou Inspection by Joeseph Elliot. T Stat not installed.
|
Electrical Rough-In | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PASS |
Daryl DeGrange
|
|
|
For access please call Richie 1/2 hr prior to inspection. ###-####. Phone #: ###-#### Inspection requested via web by Terry Scott rough-in ok cover masterbedroom and bath remodel, no floor heat at this time.
|
Final | 9/8/2016 | 9/9/2016 | 9/8/2016 | A | CANC |
James Ady
|
|
|
For access please call Richie 1/2 hr prior to inspection ###-#### Phone #: ###-#### >> Inspection requested via web by Terry Scott Inspection cancelled from web by: Terry Scott
|
Issue PAID IN FULL permit | | | 9/8/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/8/2016 | | DONE |
|
|
|
This permit was created on the web by Terry Scott
|