Final | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Mark Moncarr
|
|
|
fixed breaker disconnect in garage and isolated outside outlet Phone #: ###-#### Inspection requested via web by todd cline final ok
|
Final | 11/26/2016 | 11/28/2016 | 11/28/2016 | A | FAIL |
Eric Story
|
|
|
garage door is installed, side door is open Phone #: ###-#### Inspection requested via web by todd cline 230.71 Shall not exceed more then 6 service disc 210.52(g)(1) Branch circuits suppling garage outlets shall not serve any outside receptacles 330.12 Type MC cable shall not be used where subject to physical damage 408.32(d) Back fed devices shall fastened in place
|
Electrical Rough-In | 11/20/2016 | 11/21/2016 | 11/21/2016 | A | PASS |
Mark Moncarr
|
|
|
Garage is in back and there is no garage door installed yet. Phone #: ###-#### Inspection requested via web by todd cline ok cover. Upon final garage panel needs 60a breaker and correct wiring if needed. 230.79(D)
|
Rough-In Permanent Service | 10/27/2016 | 10/31/2016 | 10/31/2016 | A | PASS |
Mark Moncarr
|
|
|
I need a pipe in trench inspection. They will be pouring a driveway and the new sidewalk goes right over the new electrical line, they want to pour the sidewalk at the same time because of pumper truck rental. The pipe will just be stubbed up on both sides. The general needs to have the conduit in before he can get it poured. The conduit will be at 24 inches sch. 80 the whole way. the run is horizontily only about 12 ft. The new conduit will be for a 50 amp service to the new garage and will be 1 inch conduit. and the wire will be THHN #6. Thanks Todd Cline Owyhee Electric Phone #: ###-#### Inspection requested via web by todd cline ok cover
|
Issue PAID IN FULL permit | | | 10/26/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/26/2016 | | DONE |
|
|
|
This permit was created on the web by todd cline
|