Final | 4/14/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey final ok
|
Rough-In Permanent Service | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey BLD to check soffits. Contractor stated all is where it needs to be with other questions. Rough in ok cover p/s u/g n ok
|
Rough-In Permanent Service | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey 110.3- Service feeders not installed. 210.52(A)- Receptacle outlet shall be installed for 6' wall space to right of fireplace. 210.52(B)- Pantry counter top shall have receptacle outlet layout same as kitchen. 210.52(D)- Master bath vanity receptacle is placed behind wall and will ot be in place to serve basin. 250.110- Equipment ground shall be connected in temp connection of furnaces and abrasion protection shall be present as per 300.4. IBC- Boxes for soffit cans shall be down to soffit material for air seal. 590.6- 50 amp GFCI receptacle in temp pole will not trip.
|
Final | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey Needed rough in and permanant service.
|
Issue PAID IN FULL permit | | | 11/10/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/10/2016 | | DONE |
|
|
|
This permit was created on the web by Neal Rumsey
|