Case Summary (ELE) | | | 3/10/2017 | | DONE |
Christina Prado
|
|
|
|
Electrical Rough-In | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Eric Story
|
|
|
Solar array inspection Scope of work and materials all listed
|
Final | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Eric Story
|
|
|
Solar array inspection Solar array final ok
|
Electrical Rough-In | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | CANC |
Eric Story
|
|
|
Rough-in for solar install No one on site reschedule for pm
|
Case Summary (ELE) | | | 3/7/2017 | | DONE |
|
|
|
|
Final | 2/28/2017 | 3/6/2017 | 3/6/2017 | P | CANC |
Eric Story
|
|
|
Jen-ext 123 Phone #: ###-#### Need inspection for 3/7/17...
|
Electrical Rough-In | 3/6/2017 | 3/7/2017 | 3/6/2017 | A | CANC |
Eric Story
|
|
|
Jen-ext 123 Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/26/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/26/2017 | | DONE |
|
|
|
This permit was created on the web by Ashley White
|