Final | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PASS |
Eric Story
|
|
|
Rocky Phone #: ###-#### Final for panel added in kitchen and moving panel in grid ok
|
Final | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | CANC |
Eric Story
|
|
|
Rocky-please call 30 minutes prior to meet Phone #: ###-####
|
Electrical Rough-In | 2/17/2017 | 2/17/2017 | 2/17/2017 | P | CANC |
Eric Story
|
|
|
would like call 30min ahead; Rocky Phone #: ###-#### Needed conference only at this time
|
Conference | 2/17/2017 | 2/17/2017 | 2/17/2017 | P | DONE |
Eric Story
|
|
|
would like call 30min ahead; Rocky Phone #: ###-#### Panel being added in kitchen area will be coming from existing gear owner will provide work space platform to conform with current code for work space clearences. Panel that was added in suspended ceiling will be brought to a readily acessible location in hallway and will only refeed two outside circuits for block heaters and will refeed panel with max 60 amp OCPD
|
Application received | | | 2/17/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/17/2017 | | DONE |
|
|
|
|
First Notice | 3/3/2017 | 3/3/2017 | | | |
Eric Story
|
|
|
|